Ambedkar statue in Vijayawada cost location

Ambedkar Statue in Vijayawada Height and New Entry Fees

The Dr. B.R. Ambedkar statue in Vijayawada, is set for its grand inauguration on January 19, 2024. Reaching a height of 125 feet, this bronze and steel at a cost of over ₹ 845 crores, location is Swarajya Maidan. While the official entry fee and timings are yet to be announced
#StatueOfSocialJustice

Ambedkar statue Entry fee

Entry

  • Adults/Children: Rs. 5/-
  • Differently Abled: Free Entry

Parking

  • Two-Wheeler: Rs. 10/-
  • Four-Wheeler (up to 15 passengers): Rs. 30/-
  • Bus (more than 15 passengers): Rs. 100/-

Photography & Cinematography

  • Commercial Photography: Rs. 1000/-
  • Cinematography: Rs. 5000/-

The Dr. B.R. Ambedkar Statue in Vijayawada is currently not operational or open to the public, including for entry fees. The construction was completed recently, but the official inauguration and opening date is 19-01-2024

Ambedkar statue Timings

The official inauguration ceremony is scheduled for January 19, 2024. Once inaugurated, the specific timings for visiting the statue and the surrounding Dr. B.R. Ambedkar Smriti Vanam (memorial park) will be announced by the Andhra Pradesh government.

Why is B. R. Ambedkar's statue always pointing?

Ambedkar’s statue doesn’t point to a place, it points to a promise. A promise of progress, of equality, of a future where every Indian stands tall. We’ve stumbled along the way, but his unwavering gaze keeps us moving forward, forever chasing the dream he set before us.
#StatueOfSocialJustice

Ambedkar statue in Vijayawada location

The monumental 125-foot Dr. B.R. Ambedkar statue in Vijayawada is located at Swarajya Maidan, formerly known as PWD Maidan.

  • Address: Ambedkar Smruti Vanam, Swarajya Maidan, MG Road, Vijayawada, Andhra Pradesh, India.
  • Transportation: You can reach the statue by taking an auto rickshaw, bus, or taxi from any part of the city.

Jan Bhagidhari (Samajika Samatha sankalpam)

The Andhra Pradesh government is organizing a Jan Bhagidhari program from January 7th to 18th, 2024, to celebrate the inauguration of the Dr. B.R. Ambedkar Statue in Vijayawada. Various events are planned at village/ward, mandal, district, and state levels. A state committee will oversee the program’s success and guide district officers. Village and ward secretariats will hold their own events between January 7th to 11th.

Ambedkar statue in Vijayawada Cost

Initial Estimates:

  • The project was initially estimated to cost around ₹100 crore ($12.4 million) back in 2016 when the previous TDP government planned it.
  • However, after the current YSRCP government took over in 2019, they decided to allocate a more prominent plot for the statue and significantly upgrade the project.

Final Expenditure:

  • As of January 2024, the total cost of the project is reported to be around ₹400 crore ($48 million).
  • This includes not just the statue itself, constructed from 518 tonnes of bronze and steel, but also the development of the surrounding Dr. B.R. Ambedkar Memorial Park.
  • The park features facilities like a multi-purpose convention hall, an Ambedkar library, a Buddhist meditation hall, an open-air theatre, and landscaped gardens.

డా॥ బి.ఆర్. అంబేద్కర్ విగ్రహం ప్రత్యేకతలు

  • విగ్రహం ఎత్తు 125 అడుగులు, వెడల్పు: 45.5 అడుగులు, పీఠం ఎత్తు 81 అడుగులు. మొత్తం ఎత్తు 206 అడుగులు.
  • విగ్రహం స్వరాజ్ మైదానంలో నిర్మించబడింది.
  • పీఠం 3,481 చదరపు అడుగుల విస్తీర్ణంలో ఉంది.
  • పీఠం బౌద్ధ వాస్తు శిల్పకళ లోని కాలచక్ర మహా మండల డిజైన్‌తో నిర్మించబడింది.
  • విగ్రహం బరువు: 465 టన్నులు
  • పీఠం జీ+2 ఐసాసిలెస్, ట్రెపీజియం ఆకారంలో ఆర్సీసీ నిర్మాణంతో నిర్మించబడింది.
  • విగ్రహం నిర్మాణం: 2021 డిసెంబర్ 21న శంకుస్థాపన, 2024 జనవరి 19న ప్రారంభం
  • పీఠం రాజస్థాన్ పింక్ శాండ్ స్టోన్‌తో తాపడం చేయబడింది.
  • స్మృతివనం విస్తీర్ణం: 18.81 ఎకరాలు
  • స్వరాజ్ మైదానంలో పచ్చదనం: 8.9 ఎకరాలు
  • విగ్రహం కిందిభాగంలో గదులు: గ్రౌండ్, ఫస్ట్, సెకండ్ ఫ్లోర్లు
  • యాంఫీ థియేటర్, మ్యూజియం, గ్రంథాలయం, ఎక్స్ పీరియన్స్ సెంటర్ ఏర్పాటు
  • విగ్రహ తయారీకి ఉపయోగించిన పదార్థాలు: 112 మెట్రిక్ టన్నుల కంచు, 352 మెట్రిక్ టన్నుల స్టీల్
  • విగ్రహ నిర్మాణంలో పాల్గొన్న వారు: ఢిల్లీ డిజైనర్లు, కృష్ణా జిల్లా శిల్పి ప్రసాద్
  • ఖర్చు: దాదాపు రూ.400 కోట్లు
Spread the love

Leave a Comment

Your email address will not be published. Required fields are marked *

Scroll to Top